Bathrooms built right behind the tile, not just on it.
Primary baths, hall baths, and powder rooms. Waterproofing, blocking, and ventilation done before the finishes go up.
The whole job, written down.
- Demo to studs where needed
- Shower waterproofing system, photographed
- Blocking for grab bars, glass, and accessories
- Tile, vanity, fixtures, and trim
- Ventilation checked and corrected
Where the quality actually lives.
These are the parts you won't see once the job is finished. We photograph them so you can.
- WaterproofingMembrane system installed and photographed before tile covers it
- BlockingWood blocking for future grab bars, even if you don't want them now
- SlopeShower floors sloped to the drain, checked with a level
- VentilationFan sized for the room and ducted outside, not into the attic
What you'll choose.
Room & scope
Which bathroom · How much changes · Room size
Which bathroom: Primary bath, Hall or guest bath, Kids' bath, Powder room
Shower & tub
Shower · Tub · Shower glass · Tile coverage
Shower: Tub-shower combo, Walk-in tiled shower, Curbless shower, Keep existing
Vanity & finishes
Vanity · Fixture finish · Floor · Extras
Vanity: Single sink, Double sink, Floating vanity, Furniture-style
Site & timing
City · When to start · Photos · Notes
Bathroom Remodeling projects
What people ask before calling.
Something else on your mind? Ask on the phone. We'd rather answer it now than after you've signed.
Can you convert my tub to a walk-in shower?
Yes, it's one of the most common jobs. We check the drain location and floor framing first.
Curbless shower?
Possible in many homes. It may mean recessing the floor framing, which we check at the visit.
What does it cost?
It depends on the size, the conditions on site, and the selections. We don't publish prices because a number without a site visit is a guess. The visit is free and the proposal is in writing.